Update all documentation footers from generic "April 2026 / 2.1+" to the specific sync date (April 9, 2026) and documented version (2.3.0). Also add version/date footers to zh/CATALOG.md and zh/01-slash-commands/README.md which were missing them. Generated with [Claude Code](https://claude.ai/code) via [Happy](https://happy.engineering) Co-Authored-By: Claude <noreply@anthropic.com> Co-Authored-By: Happy <yesreply@happy.engineering>
30 lines
800 B
Markdown
30 lines
800 B
Markdown
---
|
|
description: Clean up code, stage changes, and prepare a pull request
|
|
allowed-tools: Bash(git add:*), Bash(git status:*), Bash(git diff:*), Bash(npm test:*), Bash(npm run lint:*)
|
|
---
|
|
|
|
# Pull Request Preparation Checklist
|
|
|
|
Before creating a PR, execute these steps:
|
|
|
|
1. Run linting: `prettier --write .`
|
|
2. Run tests: `npm test`
|
|
3. Review git diff: `git diff HEAD`
|
|
4. Stage changes: `git add .`
|
|
5. Create commit message following conventional commits:
|
|
- `fix:` for bug fixes
|
|
- `feat:` for new features
|
|
- `docs:` for documentation
|
|
- `refactor:` for code restructuring
|
|
- `test:` for test additions
|
|
- `chore:` for maintenance
|
|
|
|
6. Generate PR summary including:
|
|
- What changed
|
|
- Why it changed
|
|
- Testing performed
|
|
- Potential impacts
|
|
|
|
---
|
|
**Last Updated**: April 9, 2026
|